WCPI search results

[new search]

5 results (sorted by title)

Display as: brief entries full entries data grid

add to order image no. contact sheet collection creator title description subject(s) date
52105 A1579 Winnipeg Free Press Collection     A 59 Ton, 47 Meter Steel Girder Is Lifted Into Place On The New Bridge Spanning The Red River North Of Selkirk, Mb  BridgesConstructionRivers 1986, September 11
52107 A1579 Winnipeg Free Press Collection     George Girourd, Of Westland Construction, Prepares To Move Winnipeg'S Historic Barber House To An Elgin Avenue Location. The House, One Of Winnipeg'S Oldest, Was Built In 1862 For E.L. Barber  ConstructionHistoryHousesPersonalitiesWinnipeg BuildingsWinnipeg Streets 1986, September 11
52256 A1584 Winnipeg Free Press Collection     Paving Blocks Being Installed In Place Of Ashphalt On A Residential Street In Winnipeg  ConstructionHousesWinnipeg BuildingsWinnipeg Streets 1986, September 11
52106 A1579 Winnipeg Free Press Collection     Steve Car (Front) And George Girourd, Of Westland Construction, Prepare The Winnipeg Historic Barber House For A Move From 99 Euclid Avenue To Elgin Avenue. The House, One Of Winnipeg'S Oldest, Was Built In 1862 By E.L. Barber  ConstructionHistoryHousesPersonalitiesWinnipeg BuildingsWinnipeg Streets 1986, September 11
52108 A1579 Winnipeg Free Press Collection     The Plaque Indicating Winnipeg'S Barber House As An Historic Building. The House Was Built In 1862 For E.L. Barber  HistoryHousesPlaquesWinnipeg Buildings 1986, September 11